BSN Medical in South Africa a multinational company embarked on a global green initiative with the objective of reducing their impact on the environment as well as reducing their operational costs. The Tizagenix water division was selected to design and install a mega rainwater harvesting system at their Pinetown factory in Durban South Africa.The installed system has recovered over 10 million liters of rainwater during the past 12 months.

Raincell tanks

Our company was commissioned to design and install a rainwater harvesting system for a new house in Hillcrest. We worked with the client and his gutter contractor from early in the construction process.The result is a very well designed  integrated system

 Intergrated rainwater harvesting system

Our company installed and commissioned an integrated rainwater harvesting and grey-water system at a property in Sable Hills next to Roodeplaat dam in Pretoria. At the start of the project our engineering team worked with the architect to ensure that the system can be integrated into the design of the building. Effective analysis of the cost resulted in the design of a basement area where the rainwater harvesting tanks and purification system are situated.

Wisy WFF150 intergrated system

Our company designed and installed an integrated rainwater system for a house in Berea in Durban.The owner of the house had demolished the previous structure and have used the existing foundations and part of the structure to design a new house.

Rainwater harvesting system for indoor tennis court

Use-Rainwater designed and installed a potable rainwater harvesting system for a tennis academy in Durban. The design required a 40000l rainwater harvesting system instead of installing a 15000l soak pit as was required by the Durban Metro.Tennis Plus is the first Tennis academy in South Africa that has built a private indoor tennis court. The court is covered by approximately 660sqm of corrugated roof.